Balmain Hospital – ENERMAX SMARTcube Gas Boosted System
Project:
Inner Sydney suburban hospital requiring replacement of 30-year-old water heating plant to supply wards, kitchen and general amenities. Due to its age and condition, concerns existed that it could not support ongoing demands of the facility. Upgrading of the plant was therefore required to ensure consistent and reliable supply of hygienic hot water, and to deliver energy reduction and plant durability.
Essential that the system replacement be conducted with minimal disruption to hot water supply.
System Requirements:
Reliable, uninterrupted hot water delivery to the facility. Must be capable of delivering a peak of 8,110L per hour at 65°C. Energy efficiency should be superior to the existing system, and ongoing maintenance requirements minimised.
Original System:
Outdated technology with a 30-year-old gravity-fed DHW system comprising:
Being gravity fed, this plant was located over two levels – storage tank on level 6 (top level), with boilers on level 5.
ENERMAX System Solution:
Future capability for Solar PV supplementary energy supply – as ENERMAX SMARTcube is easily converted to take directly up to 2kW of DC Solar PV input per tank, through simple fitting the ROSC20 solar module and its connection to a Solar panel array if installed.

System Performance:

Summary:
This ENERMAX solution provides reliable hygienic heated water for this health care installation. The system is superior in operation to that it replaces and delivers the high hot water volume required at lower energy cost. The unique design not only ensures hygienic hot water, but improved long term durability at lower maintenance costs. The ability to supplement the energy requirements with Solar PV at a future time if desired, is easily accommodated through the ENERMAX SMARTcube design.