250 Room Hotel, Mascot – ENERMAX SMARTcube Gas Boosted system
Project:
11-storey 250 room leading International hotel adjacent to Sydney airport. Upgrading of hot water plant to deliver consistent and reliable heated water, energy reduction and durability.
Replacement of conventional gas boilers, feeding into large, pressurised storage tanks (now rendered obsolete and no longer part of system).
Essential that the system replacement be conducted with minimal disruption to hot water supply.
System Requirements:
Reliable hot water delivery over the full 11 storey building to accommodation rooms. Must be capable of consistently delivering 9,000L per hour at 65°C. Improved energy efficiency required together with system durability.
Original System:
ENERMAX System Solution:
System is spilt over 2 plant locations – Level 1 and Level 8 – for consistent pressure delivery across all floors.

System Performance:

Summary:
This ENERMAX solution is a fit-for-purpose system. It provides hygienic heated water across 11 levels meeting client requirements for high volume consistent water heating delivery. Impact on heated water supply at changeover was minimal. Condensing gas burners deliver improved energy efficiency for energy savings over the system’s life. System durability and service costs, particularly of the Continuous Flow gas units, will be reduced due to the unique ENERMAX SMARTcube non-pressurised heat exchange system design.